TYPICAL TRENCHLESS PROJECTS
By Trenchless Design Engineering Ltd


WATER SUPPLY & DISTRIBUTION

SEWER, STORM & CULVERTS

SEWAGE FORCEMAINS

INDUSTRIAL & PROCESS

EVALUATIONS & INSPECTIONS

SPECIAL BYPASS SYSTEMS

PRODUCT DEVELOPMENT

    
WATER SUPPLY & DISTRIBUTION (Construction completed except as noted) (Back to Top)
FIFTY RD DISTRIBUTION WATERMAIN, CITY OF HAMILTON
1,150 m of 250 mm CI by HDPE sliplining. 200 m of 200 mm CI by CIPP lining. 2005
BATHGATE ROAD DISTRIBUTION MAIN SLIPLINING, CITY OF OTTAWA
700 m of 400 mm CI sliplined with HDPE. Full pressure liner solution. Construction scheduled for fall 2004.
SOUTH STREET SUPPLY MAIN SLIPLINING, CITY OF HALIFAX
300 m of 24" concrete pressure pipe sliplined with HDPE. Full pressure liner solution. 2003
DERRY ROAD SLIPLINING PHASE 4 & 5. REGION OF HALTON
3 km (1.9 miles) of HDPE sliplining of 12" CI watermain. Construction planned for 2006.
CENTRAL WILLOWDALE CEMENT MORTAR LINING. CITY OF WATERLOO
26,000 meters (85,000 ft) of cement mortar lining of existing cast iron and ductile iron water mains 100 - 400 mm.
HUGHES AVE SUPPLY MAIN SLIPLINING. ST. THOMAS
2.2 km (1.4 miles) of HDPE sliplining of 80 year old steel water supply main. 100 psi operating pressure.
(Project Details)
A, B, C LINES FROM LEMIEUX ISLAND WTP - OTTAWA, ONTARIO
Condition assessment and rehabilitation design of 48/51" steel pipelines. Determine replacement versus rehabilitation and determine materials and design. This project for several thousand meters of pipeline in progress. Construction planned for 2004. With Robinson Consultants Inc.
GLOUCESTER STREET WATERMAIN - OTTAWA, ONTARIO
Full structural rehabilitation of 1.4 km of 36" cast iron watermain located in downtown core by sliplining with HDPE. Design, specifications and inspection. Grouted installation. Used Aqua-Grip couplings. Project presented at NASTT No-Dig 2000 Conference and Canadian Consulting Engineers 2000 Award of Merit winner. With Robinson Consultants Inc. (Project Details)
LAURIER ST. CANAL CROSSINGS - OTTAWA, ONTARIO
Full structural restoration of twin 30" cast iron crossings under Rideau Canal by sliplining with HDPE. For installation fall 2001. With Robinson Consultants Inc.
UNIVERSITY AVE WATERMAIN PHASE 1 & 2 - WATERLOO, ONTARIO
Full structural rehabilitation of 700 m of 12" ductile iron watermain. Reconnection of services using electrofusion tapping tees. Ungrouted. Included section of directional drilling under culvert. Phase 1 1998, Phase 2 1999.
DERRY ROAD SLIPLINING PHASES 3. HALTON, ONTARIO
Full structural restoration of 300 m of 12" cast iron water main by sliplining with HDPE. Design, specifications and inspection. Ungrouted installation. Used electrofusion fittings. Directional drilling included.
CHARLO PIPELINE - DALHOUSIE, NEW BRUNSWICK
Rehabilitation of 3,000 ft of 32" wood stave pipeline by 3 HDPE sliplines including one 1,300 ft pull through curve section of wood stave pipe. Design of installation method and installation supervision. Pipeline out of service for less than 60 hours.
DERRY ROAD SLIPLINING PHASES 1 & 2. HALTON, ONTARIO
Full structural restoration of 2.7 km of 12" cast iron water main by sliplining with HDPE. Design, specifications and inspection. Ungrouted installation. Used electrofusion fittings. Directional drilling included. Project presented at NASTT No-Dig 95 Conference.
       
SEWERS, STORMS AND CULVERTS (Construction Completed) (Back to Top)
STERLING AVE CSO, HAMILTON, ONTARIO
1200 & 1350 mm outfall into ravine. Condition assessment and rehabilitation design. For construction 2006
OSWEGO PARK, HALDIMAND COUNTY
Sewer condition assessemnt, 200 mm sewer network to pump station, regarding excessive flow, 2005
MILL STREET CSO, HAMILTON ONTARIO
900 & 1200 mm. Condition assessment. 2005
CIPP TESTING PROGRAM, HAMILTON, ONTARIO
Analyse 3 years of CIPP testing. Design new program to integrate CIPP liner design parameters with testing results. Prepare provisions for RFP for multi-year testing contract.
WALMART STORE, TORONTO, ONTARIO
1125 mm brick sewer. Design for CIPP liner. Constructed 2004
FERGUSON AVE COMBINED SEWER - HAMILTON, ONTARIO
Panel lining (GRP) in 500 m of horseshoe shaped brick sewer. Type II design. Incorporated provisions for future bridge embankment. Major bypass involved.
CARLAW BOX STORM SEWER - TORONTO, ONTARIO
Grouted in place panel liner (GRP). 700 meters of 1200 x 1000 box section storm sewer. Constructed 2002-03
CARLAW BOX STORM SEWER EVALUATION - TORONTO, ONTARIO
Evaluation and preliminary design for trenchless renewal options for 700 meter of 1200 x 1000 box section storm sewer. For City of Toronto.
DON VALLEY PARKWAY 1998 - TORONTO
Rehabilitation of 15/24/30/36/42" culverts under 6 lane highway using cured-in-place (CIPP) liners and grouted-in-place (GIP) sectional HDPE liners. Design of CIPP liners and profile wall HDPE liners and grouting. For installation contractor.
DON VALLEY PARKWAY 1997 - TORONTO
Rehabilitation of 24" to 60" culverts under 6 lane highway using grouted-in-place (GIP) sectional HDPE liners. Design of liners (solid and profile wall) and grouting. For installation contractor.
COLD WATER CREEK SEWERS - HAMILTON, ONTARIO
CIPP rehabilitation of 1,800 meters of 8-21" sewers in environmentally sensitive wetland conservation area. Specifications for construction. For City of Hamilton.
CAVE CREEK COLLECTOR - OTTAWA, ONTARIO
CIPP and PVC GIP (Danby) liner rehabilitation 36-72" collector sewers. For installation contractor.
HWY 400 MEDIAN STORM DRAINS - BARRIE, ONTARIO
CIPP Rehabilitation of 5,000 meters of 6-30" sewers on Hwy 400 North of Toronto. Design of full length liners and spot repairs. Provided quality control as per MTO CORE plan for all liner, spot repair and joint grouting. For installation contractor.
        
SEWAGE FORCEMAN (Construction complete) (Back to Top)
GRAND RIVER FORCEMAIN - PORT DOVER, ONTARIO
CIPP lining of 16" steel forcemain. Design of temporary bypass system, identification and location of break and design of CIPP liner. For installation contractor
   
INDUSTRIAL & PROCESS (Construction completed) (Back to Top)
PEMEX SALINA CRUZ REFINERY - SALINA CRUZ, MEXICO
CIPP lining of process sewers. 24" installations. For installation contractor.
PETRO-CANADA REFINERY - MONTREAL
Evaluated lining options for product delivery lines from refinery to ship dock. Both heavy walled epoxy lining and fold/form polyamide liners evaluated. Included Life Cycle Cost Analysis and risk analysis. Recommended not to use any linings due to pressures, temperatures and safety issues on deteriorated steel pipes. For Petro-Canada.
PEMEX TULA REFINERY - TULA, MEXICO
CIPP lining (vinyl ester) of process sewers in refinery, 30 installations of 8"-24". Liner specifications, design, project management and inspection for permanently surcharged waste water and refinery effluent collection system. Coordinated technology transfer, material supply and crew training for Mexican installation contractor.
PEMEX SALAMANCA REFINERY - SALAMANCA, MEXICO
CIPP lining (vinyl ester) of process sewers in refinery, 30 installations of 8"-30". Liner specifications, design, project management and inspection for permanently surcharged waste water and refinery effluent collection system. Coordinated technology transfer, material supply and crew training for Mexican installation contractor.
   
PRODUCT DEVELOPMENT (Back to Top)
CIPP SPOT REPAIR FOR SEWER
Analyzed results of testing program to derive thickness design basis for reinforced CIPP Spot Repair product. Provided schedule of spot repair thicknesses for various depths and conditions. For installation contractor.
CIPP SPOT REPAIR FOR SEWER
Set up and conducted testing program for CIPP spot repair product. Analyzed results of testing program to derive thickness design basis for non-reinforced CIPP Spot Repair product. Provided schedule of spot repair thicknesses for various depths and conditions. For installation contractor, Manitoba
CIPP LATERAL LINER
Provided general technical input in reference to marketing of lateral liner. For manufacturer, Montreal
   
EVALUATIONS & INSPECTIONS (Back to Top
HDPE FOLD/FORM LINER INSTALLATION. TORONTO
Comprehensive inspection and evaluation of major HDPE fold & form sewer liner installation, 12" ­ 18". Developed criteria for structural evaluation, fit, shape etc. Recommendations for remedial work were carried out including some removal and replacement of liners.
PVC SPIRAL WOUND LINER INSTALLATION. TORONTO
Comprehensive inspection and evaluation of major PVC spiral wound sewer liner installation. Developed criteria for structural evaluation, fit, shape etc. Recommendations for remedial work.
PVC FOLD/FORM LINER INSTALLATION
Evaluated installed "PVC" type fold and form liner installation. Advised on removal procedures. For installation contractor.
   
SPECIAL BYPASS SYSTEMS (Back to Top)
FULLY AUTOMATIC VACUUM BYPASS SYSTEM FOR BUILDING SERVICES DURING LINING. TORONTO
Design, training and supervision for movable automatic vacuum system for maintaining continuous sewer service to 100s of nightclubs, bars, restaurants, offices and retail stores. Used during CIPP lining operations. Automatic Vacuum Actuator Valves (no electrical connections) temporarily located inside buildings maintained 100% sewer service during all phases of 18" CIPP. Very successful. Project presented at NASTT No-Dig 2000 Conference.For installation contractor.
See Vacuum Valve..
   